| |
| Technical Specialty |
| Space Frame Systems |
|
| System Details |
|
| |
|
|
 |
| |
| Erection |
|
Prior to erection general site conditions and condition of the structure on which space frame is to be erected shall be checked by an engineer of UZAY KONSTRUKS?ùYON Engineer and unsatisfactory conditions are reported to main contarctor to allow to start erection .
Erection shall be done strictly acoording to approved shop drawings. Erection shall be done by professional erection crews based on Uzay Konstruksiyon Engineers instructions.
Erection can be done both on ground and lifted by cranes or at sight with helps of scaffoldings. All bolts shall be correctly tightened . All supports shall be correctly placed and rotated based on shop drawings. Site welds of the supports shall be done by certified welders.
|
| |
|
| |
|